
Critical Path (2026)
2026 · 34 min · Short (under 1h30)
Released 10 July 2026
Starring: Justin Styer, Elon Musk, Tim Southerton, Bobby Peden, Jenna Lowe, Graham Kersey, Suren Sanai, Austin Dunbar
The engineering journey to Starship and beyond.
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
Test Like You Fly
The Holy Grail of Rocketry
Go For Orbit
Interstellar: Nolan's Odyssey
The Corporation
Titanic: The Digital Resurrection
Collapse
Mariah Carey's Magical Christmas Special
David Attenborough: A Life on Our Planet
Star Trek
Last Breath
Sunshine
Cloverfield
Starship